SharePoint as the document control platform for contract documents, drawings, specifications, submittals, RFIs, and the project documentation that construction litigation depends on. With version control, access discipline, and the retention policies that protect you for the statute of limitations period.
SharePoint project sites with standard libraries for drawings (current revision), submittals, RFIs, ASIs, daily logs, meeting minutes, change orders, and correspondence. Version control, metadata, and the access discipline that ensures the right project team members see the right documents.
Project archival on closeout with retention aligned to the statute of limitations. eDiscovery readiness for construction disputes. Litigation hold capability for active claims. The ability to produce project documents four or eight years after completion without a three-month paralegal scramble.
Modern intranet for company-wide resources — safety programs, training materials, HR policies, equipment procedures, and the operational content that benefits from good information architecture and search.
Microsoft 365 consulting for construction — field and office collaboration, document control, and frontline worker deplo...
Microsoft Copilot for construction — agents grounded in specs, submittals, contract docs, and safety procedures....
Power Platform consulting for construction — Power Apps, Power Automate, Power BI with offline-first field design and ER...
Power Automate for construction — change order approvals, insurance cert tracking, sub onboarding, and procurement workf...
Procore is purpose-built for construction field documents — RFIs, submittals, daily logs, photos. SharePoint is stronger for long-term document retention, company-wide document management, and the eDiscovery capabilities litigation requires. Many contractors use both: Procore for active project field documents, SharePoint for contract documents, archive, and company-wide content.
The statute of limitations for construction defect claims varies by jurisdiction — typically 6-12 years from substantial completion, though some jurisdictions have longer periods for latent defects. We configure retention policies based on your legal counsel's guidance and the jurisdictions where you work.
Yes. Pre-qualified SharePoint developers and information architects with construction experience — project document control, retention design, eDiscovery, and the governance discipline construction litigation requires. 4-stage consulting-led matching, 92% first-match acceptance.
Project sites, version control, retention, eDiscovery — SharePoint built for the documents construction litigation depends on.
Tell us what you need. We will send curated profiles within 4 days.