Integration between SCADA historians, production accounting (P2, Quorum, Enertia), CTRM (Allegro, Aspect, OpenLink), GL, and field operations systems — with the measurement-to-ticket-to-GL flow, hedging-to-physical reconciliation, and audit trail oil and gas integration requires.
Integration from SCADA historians to production accounting — measurement validation, allocation application, back-allocation for corrections, and the reconciliation that proves SCADA volumes tie to accounting volumes.
Integration from P2, Quorum, Enertia to the GL — revenue recognition, LOE capture, JIB calculation with partner-specific methodology, and the audit trail partner disputes require.
Integration with CTRM (Allegro, Aspect, OpenLink) for disposition assignment, hedging mark-to-market, physical-financial reconciliation, and the hedge accounting that supports SEC reporting.
Data engineering for oil and gas — WITSML, SCADA, production accounting, DCS, and subsurface data pipelines with well ma...
Data warehousing for oil and gas — Snowflake, Databricks, Synapse, Fabric with well master data and production allocatio...
Business intelligence for oil and gas — production reporting, AFE tracking, JIB reconciliation, and reserves-aligned das...
Financial analytics for oil and gas — LOE per barrel, well economics, AFE tracking, JIB reconciliation, and reserves-bas...
Yes — both platforms have integration patterns to GL systems (SAP, Oracle, D365 F&O, BC). The specific work involves the chart of accounts mapping, allocation methodology encoding, and the reconciliation that proves the GL ties to production accounting. We've built these integrations for multiple operators.
Through integration patterns that support restated production periods — SCADA volumes get reallocated when wells-on-meter relationships change, measurement corrections propagate downstream, and the audit trail shows what changed. This is specific oil and gas work that generic integration misses.
Yes. Pre-qualified integration engineers with upstream, midstream, or downstream experience — SCADA-to-accounting, production accounting-to-GL, CTRM, and the measurement-to-ticket discipline oil and gas integration requires. 92% first-match acceptance.
Measurement to ticket to GL, hedging to physical — oil and gas integration with the reconciliation partners and auditors expect.
Tell us what you need. We will send curated profiles within 4 days.