A consumer goods manufacturer's 20-year-old on-premises ERP was reaching end of life. We migrated to Azure with zero-downtime cutover and modernized integrations — reducing infrastructure costs by 35%.
A consumer goods manufacturer's 20-year-old on-premises ERP was reaching end of life. We migrated to Azure with zero-downtime cutover and modernized integrations — reducing infrastructure costs by 35%. The organization had reached an inflection point — production efficiency metrics were tracked in spreadsheets updated after each shift — by which time the data was already stale. Quality issues were discovered at end-of-line inspection, not during the process where they could be corrected. Supply chain visibility ended at the factory gate.
The manufacturing industry added specific complexity. OSHA safety regulations, ISO 9001/14001 standards, and FDA compliance for pharmaceutical manufacturing demanded auditable processes and governance. Any technology initiative needed to maintain compliance continuity while delivering measurable improvement. Previous attempts had stalled because vendors didn't understand these industry-specific constraints.
The executive sponsor set clear expectations: demonstrate measurable impact within one quarter. No 18-month roadmaps. No theoretical architectures. Working software, real data, measurable results — or the budget moves elsewhere. They needed a partner who could deliver cloud & devops solutions with manufacturing domain expertise from day one.
We designed a phased approach optimized for speed-to-value while maintaining OSHA safety regulations, ISO 9001/14001 standards, and FDA compliance for pharmaceutical manufacturing continuity:
Application inventory, dependency mapping, and cloud readiness assessment. Migration wave planning prioritized by business criticality and technical complexity.
Deployed Azure landing zone with network segmentation, identity management, and OSHA safety regulations, ISO 9001/14001 standards, and FDA compliance for pharmaceutical manufacturing controls. Configured monitoring, alerting, and disaster recovery.
Executed phased migration waves: lift-and-shift for stateless applications, re-platform for databases, re-architect for legacy systems. Each wave validated before proceeding to the next.
Post-migration validation: performance testing, security scanning, compliance audit. Cost optimization through right-sizing, reserved instances, and auto-scaling policies.
Final cutover of remaining systems. Knowledge transfer to internal team. Documented runbooks and operational procedures. Established ongoing